Living at home during a remodel

Leer en español

One of the first questions people ask is whether they can stay in the house while we work. Almost always, yes.

Here is how we keep the rest of the house livable, what a temporary kitchen looks like, and what to expect while the work is going on.

Floor protection from day one

Protection goes in on the first day. Floors are covered so the parts of the house we are not working on stay as they were, and the finished rooms are not scratched or tracked through.

Dust containment

The work area is contained so the dust stays in it. The goal is that the rooms not under construction stay livable and free of dust.

Cleanup is done with HEPA vacuums, which are built to catch fine dust.

HEPA filters and negative air

At times we also run HEPA dust filters and set up negative air pressure. Negative air means a fan pulls air out of the work area. Air then flows into the work area through any gap, not out of it, so dust does not drift into the rest of the house.

Ben will tell you during planning whether your project calls for it.

Older homes and lead-safe work

If your house was built before 1978, painted surfaces may contain lead. Under the EPA’s Renovation, Repair and Painting rule, paid contractors who disturb painted surfaces in these homes must be certified and use lead-safe work practices. Those practices limit lead dust for the people living there. In Oregon the Construction Contractors Board licenses this work. We are a certified lead renovator, with an Oregon CCB Lead-Based Paint Renovation contractor license, and you get the EPA’s “Renovate Right” pamphlet before work starts.

Homes built before 2004 also need an asbestos survey before renovation under Oregon DEQ rules, done by an accredited inspector. We test for asbestos before the project begins, so the results are known before the first wall opens.

A temporary kitchen

A kitchen remodel changes daily life the most, because it takes away the room you use every day. For a kitchen remodel we often set up a temporary kitchen in a part of the house we are not working on. Often that is the garage.

We often reuse parts of your old kitchen for it, with temporary plumbing and electrical installed so it works. How much goes into it depends on what you want. Ben talks through living arrangements at the first meeting and again during planning, so the temporary kitchen is settled before construction starts.

Bathrooms

If the house has a second bathroom, it stays in use while we work on the first. If your only bathroom is part of the project, mention it at the first meeting so it can be planned around from the start.

The crew in your house

Our crews are expected to be kind, presentable and professional. Subcontractors, such as plumbers, electricians and HVAC installers, are held to the same standards, because to you they are part of the team.

Work follows best practices and meets or exceeds building code and the manufacturers’ instructions. The office is open Monday to Friday, 7:00 am to 3:30 pm.

Knowing what is happening

Your project manager is your main contact on site. You get regular updates and scheduled walkthroughs at the house.

You also get an online client portal. It shows the current schedule, progress photos and billing. You know the start and finish dates, barring unexpected changes. If the schedule changes, you are told, and the change shows in the portal.

The office can be reached by phone, email, text or the portal. Ben is available for anything the team cannot answer.

When something unexpected turns up

Older homes hide things, like rot inside a wall that nobody could see until the wall was opened. When that happens, you get a written change order describing the work and its cost first. Ben approves every change order before it reaches you, and you approve it in the portal. Nothing is added to your bill without your approval.

Paying along the way

On a fixed-price contract, which most projects use, there is no deposit. You are invoiced monthly for the work done that month, and the final payment is due at completion. The price does not change from contract to completion, except through change orders you approve.

At the end

When the work is nearly done, your project manager walks the house with you, and every remaining item is listed and finished. Then there is a final walkthrough and your sign-off. All labor and installed material is warranted for one year from completion.

Planning a remodel?

If you want to talk through what living at home would look like for your project, I’m happy to. Fill out the contact form; it reaches us right away and we respond within a day. If you’d rather call, the office is 541-300-8118. The chat on this site can answer questions, pull up costs, code and similar projects, and send your request to the office too.