Skip to main content

PORTFOLIO

GARFIELD STREET

An Ashland hall bathroom with a cast iron tub, grab bars, birch cabinets and tiled wainscot, plus refinished fir floors, new ducts and insulation.

Planning something similar? Ask what your project would cost.

At a glance

  • Project: hall bathroom remodel, plus floors, heating ducts, insulation and plumbing in the rest of the house
  • Where: Ashland’s university neighborhood
  • Finished: 2020
  • Main work: cast iron tub with tiled walls, tiled wainscot, birch cabinets and linen tower, quartz countertop, grab bars, refinished fir floors, asbestos duct removal and new ducts
  • Performance and green features: blown-in attic insulation, new underfloor insulation, new heating ducts, galvanized pipes under the house replaced with new piping, heating oil tank removed, humidity-sensing bath fan, ten-year battery smoke detectors that talk to each other wirelessly

This project would cost about $91,000 to $150,000 to build today, based on what it cost when it was built, adjusted to today’s prices.

Read the full case study

The house and what the owners wanted

The hall bathroom in this house on Garfield Street had an old tub and shower, a medicine cabinet and wainscoting. The family wanted a larger tub and shower, grab bars and new cabinets.

Our first plan in February 2020 was a larger tiled shower. By April the plan had changed to a larger cast iron bathtub with tiled shower walls, which is what we built.

Over the spring of 2020 the work grew to the rest of the house.

What was built

The bathroom

We took everything out of the room, built a new shower wall, and built out the old walls so they are flat. Solid wood backing went into the walls for the towel bars and grab bars.

The cast iron tub has tile on the walls above it, a hand shower on an adjustable bar and a curved curtain rod. Grab bars are mounted at the tub and beside the toilet.

Tile covers the lower walls all around the room, up to the bottom of the window sills, finished with a cap piece. The floor is tile.

The birch cabinets include a vanity with drawers on both sides and a full-height linen cabinet. The countertop is quartz with an undermount sink. Two mirrors hang over the vanity, one fixed and one hinged.

A fan that turns on by itself when the air gets humid vents to the outside. There is a new vanity light, a new toilet, and new door trim.

Floors

The original fir floors were under carpet. We pulled the carpet, repaired the floor in the hallway, kitchen, living room and front bedroom, fixed a rotted section of the wood base under the floor, and laid new fir in the back bedroom. Then all of it was sanded and finished together, with wood heat vents set flush with the floor and new painted baseboard.

The back bedroom sliding door was replaced and waterproofed.

Heating, insulation and plumbing

The old heating ducts were wrapped in asbestos. They were removed and replaced with new ducts, with one more heat vent added. The old heating oil tank was taken out and the holes in the foundation patched.

The attic has new blown-in insulation, and the floor has new insulation held up with white vinyl sheeting. The old galvanized steel water pipes under the house were replaced.

Finishing touches

We painted the walls, replaced the ceiling light fixtures, and added new door trim, strips where the floors meet, and a stained toe kick, the recessed strip at the base of the cabinets, in the kitchen. A handrail went in at the side stairs, and a light and outlet at the back sliding door and deck.

What made it interesting

We quoted the asbestos, the oil tank and the old pipes each on its own, and dealt with them while the bathroom work went on.

Cost context

A bathroom remodel alone typically runs $30,000 to $75,000 in our area today. This project also covered floors, heating ducts, insulation and plumbing through the house. See our cost guide.

Thinking about a similar project? Call us at 541-300-8118 or send us a note.