PORTFOLIO
HERSEY STREET
A north Ashland townhouse main floor rebuilt around a new kitchen with fir pocket doors, plus rot and flashing repairs on all six townhouses in the association.
Planning something similar? Ask what your project would cost.
At a glance
- Project: main-floor townhouse remodel, then exterior rot repair for the six-townhouse association
- Where: north Ashland
- Finished: 2019
- Size: about 500 square feet on the main floor
- Main work: new kitchen layout, two sets of triple sliding pocket doors, new beams and footing, rerouted plumbing and heating ducts, solid hickory floors, LED lighting; siding, flashing and window trim repairs on six townhouses
This project would cost about $100,000 to $165,000 to build today, based on what it cost when it was built, adjusted to today’s prices.
Read the full case study
The house and what the owners wanted
The townhouse main floor is one long space: an office at the front, the kitchen in the middle and the living room at the back. The remodel kept that order and gave the kitchen a new layout.
What was built
The kitchen
The custom cabinets are stained maple, with multiple pullouts and sliding shelves. The countertops are Carrara quartz with an undermount sink.
The appliances are sized for a townhouse: an induction cooktop, a wall oven and a full-height narrow refrigerator.
Recessed LED lights and under-cabinet LED lights are on dimmers.
Pocket doors
Two sets of three sliding pocket doors separate the office from the kitchen at the front, and the living room from the kitchen at the back. The doors are custom fir with frosted glass, so light passes through when they are closed. Open, they disappear into the walls.
Floors
The floors are wide-plank solid hickory, sanded and finished in place over the concrete slab. The slab was leveled first, and the front and back doors were raised to suit the new floor height.
Later work
In 2020 we came back and put a heated tile floor in the upstairs bathroom.
What made it interesting
The plumbing and heating ducts for the upstairs ran right through the space where the new kitchen needed to go. We opened the ceiling and the slab to see what was there, then rerouted them.
To make room, two new beams now carry the ceiling. One spans the kitchen above the front edge of the wall cabinets. The other carries the end of the first beam and spans from the stairwell wall to the wall shared with the neighbor. We poured a new concrete footing in the slab to hold them. While the pipes were rerouted, temporary piping kept water running upstairs.
The association exterior
In the fall of 2019 the townhouse association asked us to look at rot along the siding. We traced the leaks to three causes. The second-story roofs were missing kickout flashing, the small angled pieces that steer water away from the wall, where they met the walls. The small single-slope roofs over the entry doors were flashed backwards, so water ran under the roofing. Exposed window trims had no flashing over the top.
On all six townhouses we removed the leaking siding and the rotten layer under it at the walls between units. Rotten framing was treated with a copper wood preservative and reinforced, and damaged insulation was replaced. New plywood, Tyvek house wrap, flashing, kickout flashing and siding went on. The trim over the windows was flashed and waterproofed, and gutters and downspouts were repaired and redirected.
Cost context
Kitchen remodels typically run $60,000 to $150,000 in our area today. This project also opened up the main floor and repaired siding on six townhouses. See our cost guide.